Kenosha Fire Chief: Bain Fire Station plans moving forward

  • Source: Kenosha News
  • Published: 08/10/2017 01:57 AM

Kenosha Fire Chief Charles Leipzig said work to bring a new fire station to the shuttered Bain Elementary School site is going strong. Two fire stations — Station 3, 2121 Roosevelt Road, and Station 5, 2125 Washington Road — are set to close and be merged into a “super” station at 2210 52nd St. “It’s a responsible plan,” Leipzig said. Leipzig said Station 5 is not able to accommodate larger fire trucks and is in desperate need of repair, and both stations need new roofs. Leipzig said Station 5 is not able to accommodate larger fire trucks and is in desperate need of repair, and both stations need new roofs.



Comments

We welcome comments from registered users. Comments are solely the responsibility of those who post them; their viewpoints are not endorsed by the Daily Dispatch and DailyDispatch.com. (read more)
Highlight
ship name
no comments have been added


FREE QUICK SUBSCRIBE
Sign up to subscribe to custom state Daily Dispatch emails for free

click to subscribe